Highway Engineering Length of a vehicle affects extra width of pavement and minimum turning radius clearance to be provided under structures such as overbridges, under-bridges etc. width of traffic lanes width of shoulders and parking facilities extra width of pavement and minimum turning radius clearance to be provided under structures such as overbridges, under-bridges etc. width of traffic lanes width of shoulders and parking facilities ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is bitumen lime None of these cement bitumen lime None of these cement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is white yellow red green white yellow red green ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 500 vehicles per day 5000 vehicles per hour 5000 vehicles per day 500 vehicles per hour 500 vehicles per day 5000 vehicles per hour 5000 vehicles per day 500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For design, that length of transition curve should be taken which is smaller of (A) and (B) based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration higher of (A) and (B) smaller of (A) and (B) based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration higher of (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP