Highway Engineering Scientific planning of transportation system and mass transit facilities in cities should be based on traffic volume data spot speed data origin and destination data accident data traffic volume data spot speed data origin and destination data accident data ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering A traffic rotary is justified where when traffic volume is less than 500 vehicles per hour space is limited and costly when traffic volume is more than 5000 vehicles per hour number of intersecting roads is between 4 and 7 when traffic volume is less than 500 vehicles per hour space is limited and costly when traffic volume is more than 5000 vehicles per hour number of intersecting roads is between 4 and 7 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases increases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? no parking end of speed limit level crossing overtaking prohibited no parking end of speed limit level crossing overtaking prohibited ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be zero less than the pressure on inner wheels more than the pressure on inner wheels equal to the pressure on inner wheels zero less than the pressure on inner wheels more than the pressure on inner wheels equal to the pressure on inner wheels ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP