Railway Engineering Head width of 52 kg rail section is 72.33 mm 66.7 mm 61.9 mm 67 mm 72.33 mm 66.7 mm 61.9 mm 67 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B Will be more in the direction of B to A Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of A to B Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 52.5/R 35/R 70/R 105/R 52.5/R 35/R 70/R 105/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ?i) volume and nature of trafficii) speed of trainiii) physical features of the countryThe correct answer is both (ii) and (iii) only (i) (i), (ii) and (iii) both (i) and (ii) both (ii) and (iii) only (i) (i), (ii) and (iii) both (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To ensure exact gauge at the toe of the switch as well as the nose of crossing To prevent any vertical movement between the wing rail and nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To ensure exact gauge at the toe of the switch as well as the nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 552 1588 783 1353 552 1588 783 1353 ANSWER DOWNLOAD EXAMIANS APP