Railway Engineering Head width of 52 kg rail section is 61.9 mm 72.33 mm 67 mm 66.7 mm 61.9 mm 72.33 mm 67 mm 66.7 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on both (A) and (B) None of these bridges and approaches joints both (A) and (B) None of these bridges and approaches joints ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for track maintenance interlocking points and signal setting points and crossings setting marshalling yard signals track maintenance interlocking points and signal setting points and crossings setting marshalling yard signals ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 89 mm 100 mm 115 mm 95 mm 89 mm 100 mm 115 mm 95 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally the limiting value of cant is (where G is the gauge.) G/8 G/15 G/12 G/10 G/8 G/15 G/12 G/10 ANSWER DOWNLOAD EXAMIANS APP