Railway Engineering Head width of 52 kg rail section is 66.7 mm 67 mm 61.9 mm 72.33 mm 66.7 mm 67 mm 61.9 mm 72.33 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The type of spike used for fixing chairs of bull headed rails to wooden sleepers is Dog spike Rail screw Round spike Elastic spike Dog spike Rail screw Round spike Elastic spike ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Booked speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Equilibrium speed Booked speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 14.24 m 21.04 m 28.49 m 7.45 m 14.24 m 21.04 m 28.49 m 7.45 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The distance through which the tongue rail moves laterally at the toe of the switch for movement of trains is called None of these flangeway clearance throw of the switch heel divergence None of these flangeway clearance throw of the switch heel divergence ANSWER DOWNLOAD EXAMIANS APP