GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load solar power plant none of these Base load Peak load solar power plant none of these Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Very high development costs Noise, pollution and maintenance problems Low life span Synchronization problems Very high development costs Noise, pollution and maintenance problems Low life span ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Can't say Quit high Quit low almost equal Can't say Quit high Quit low almost equal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents Maximum demand of the power station base load of the system average load of the system energy generated in the period considered Maximum demand of the power station base load of the system average load of the system energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power deference of error is the main reason angle of the voltage is not considered AVR loop response is slower than LFC loop Change in voltage magnitude marginally affects real power deference of error is the main reason angle of the voltage is not considered ANSWER DOWNLOAD EXAMIANS APP