GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant Peak load Base load none of these solar power plant Peak load Base load none of these ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Very high development costs Synchronization problems Noise, pollution and maintenance problems Low life span Very high development costs Synchronization problems Noise, pollution and maintenance problems Low life span ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Quit low Quit high Can't say almost equal Quit low Quit high Can't say almost equal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents base load of the system Maximum demand of the power station average load of the system energy generated in the period considered base load of the system Maximum demand of the power station average load of the system energy generated in the period considered ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power ANSWER DOWNLOAD EXAMIANS APP