GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? solar power plant Peak load none of these Base load solar power plant Peak load none of these Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Fuel cell for power generation have drawback of _____ Synchronization problems Low life span Very high development costs Noise, pollution and maintenance problems Synchronization problems Low life span Very high development costs Noise, pollution and maintenance problems ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In comparison to steam plant, the annual fixed cost of nuclear plant is Quit low Quit high Can't say almost equal Quit low Quit high Can't say almost equal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The area under the load duration curve represents Maximum demand of the power station energy generated in the period considered base load of the system average load of the system Maximum demand of the power station energy generated in the period considered base load of the system average load of the system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power? deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power deference of error is the main reason AVR loop response is slower than LFC loop angle of the voltage is not considered Change in voltage magnitude marginally affects real power ANSWER DOWNLOAD EXAMIANS APP