GETCO Exam Paper (22-07-2015)
Which of the following is a reason to decouple AVR and LFC loops when there is a shortage of reactive power?

Change in voltage magnitude marginally affects real power
AVR loop response is slower than LFC loop
angle of the voltage is not considered
deference of error is the main reason

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The rating of given on the name plate of a transformer indicates the:

Apparent power which it draws from the supply mains
True power whichh it draws from the supply mains
Apparent power which it can supply
True power which it can supply

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which of the following is the wrong statement in terms of slack bus?

it has finite reactive power generation capability
voltage and angle is specified at this bus
it should be located at the centre of the area
it should be the largest generator bus in the system

ANSWER DOWNLOAD EXAMIANS APP