GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? none of these solar power plant Peak load Base load none of these solar power plant Peak load Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The breaking capacity of a CB is usually expressed interms of volts MW amperes MVA volts MW amperes MVA ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) What is the Antonyms of 'ENIGMA'? Understood Mystery Energetic Demise Understood Mystery Energetic Demise ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Who was the political Guru of Netaji? Lokmanya Tilak Sardar Patel Gokhle R. Das Lokmanya Tilak Sardar Patel Gokhle R. Das ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) An over-current relay of current rating 5 A and setting 150% is connected to a 200/5 A CT. Then the relay to pickup, the line current required is 300 150 100 200 300 150 100 200 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a power system network, at which bus the shunt is connected that can be known from none of these Y bus of the system type of bus reactive power demand none of these Y bus of the system type of bus reactive power demand ANSWER DOWNLOAD EXAMIANS APP