Airport Engineering Geometric design of holding apron of these statements 1 and 2 are correct 1 alone is correct 2 and 3 are correct 1 and 3 are correct 1 and 2 are correct 1 alone is correct 2 and 3 are correct 1 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Which of the following is used for servicing and repairs of the aircraft? Holding apron Terminal building Hanger Apron Holding apron Terminal building Hanger Apron ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering To cope up high temperature of 196°C, the taxi ways and aprons are constructed with Plain concrete Rubberised tar concrete All listed here Asphaltic concrete Plain concrete Rubberised tar concrete All listed here Asphaltic concrete ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : Airport capacity during IFR conditions is usually less than that during VFR conditions.Reason R: During clear weather condition (VFR), the aircrafts on final approach to runway can be spaced closer during poor visibility conditions.Select your answer based on the coding system given below: Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true but R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Effective length of a runway is the distance between Ends of the runway Point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway Ends of the clear way on either side Point of intersection of the glide path and the extended plane of the runway surface and the other end of the runway Ends of the runway Point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway Ends of the clear way on either side Point of intersection of the glide path and the extended plane of the runway surface and the other end of the runway ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity: Reason R : Landing operation is generally given priority over the taking off operation. Select your answer based on the coding system given below: A is true but R is false Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true A is true but R is false Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is false but R is true ANSWER DOWNLOAD EXAMIANS APP