Building Construction Crown is located at None of these Skew-back of the arch Highest point on the extrados of the arch Highest point on the intrados of the arch None of these Skew-back of the arch Highest point on the extrados of the arch Highest point on the intrados of the arch ANSWER DOWNLOAD EXAMIANS APP
Building Construction The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is Grooved pointing Struck pointing Truck pointing Recessed pointing Grooved pointing Struck pointing Truck pointing Recessed pointing ANSWER DOWNLOAD EXAMIANS APP
Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 3 5 4 6 3 5 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The local swelling of a finished plaster, is termed Hacking Blistering Cracking Dubbing Hacking Blistering Cracking Dubbing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m All listed here Area of footing slab = 11.00 m2 Distance of C.G. of the loads from the smaller column = 3.00 m The length of the foundation slab = 7.00 m All listed here Area of footing slab = 11.00 m2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its length parallel to the face of a wall, is a known as Closer Stretcher Header None of these Closer Stretcher Header None of these ANSWER DOWNLOAD EXAMIANS APP