Building Construction

Building Construction
If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is

4
3
5
6

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The opening provided in sloping roof with its top parallel to the roof surface, is called

Dormer window
Louvered window
Sky light window
Lantern window

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to

25 mm
35 mm
15 mm
45 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is

24
18
25
12

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pitched and sloping roofs are suitable for

Coastal regions
Covering large areas
All of these
Plain regions

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The X-ray rooms are plastered with

Plaster of Paris
Martin's cement
Barium plaster
Keen's cement

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑