Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Speeds higher than equilibrium speed Booked speed Equilibrium speed Speeds lower than equilibrium speed Speeds higher than equilibrium speed Booked speed Equilibrium speed Speeds lower than equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If a is the angle of crossing, then the number of crossings ‘N’ according to right angle method is given by cot(a) Vi cosec(a/2) cot(oc/2) Vi cot(cc/2) cot(a) Vi cosec(a/2) cot(oc/2) Vi cot(cc/2) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is sine curve cubic parabola lemniscate of Bernoulli spiral sine curve cubic parabola lemniscate of Bernoulli spiral ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of A to B Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of B to A Will be more in the direction of A to B Cannot be determined from the given data Will be maximum at the middle of A and B Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Maximum value of ‘throw of switch’ for Broad Gauge track is 89 mm 100 mm 95 mm 115 mm 89 mm 100 mm 95 mm 115 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct I and 2 are correct 1 and 4 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP