Construction Planning and Management
A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be

27 minutes
15 minutes
21 minutes
20.143 minutes

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
During the construction period, price variation clause in contracts caters to

Variation in cost in materials element, labour element and petrol-oil-lubricant element
Increase in rates of only important materials
Rate of inflation
Variation in total cost of the project on an ad hoc basis

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
At a work site, statistical quality control of concrete means

Measurement of risks to eliminate failures
Reduction in wastage of inspection costs
Reduction in costs for the removal of defects
Applying the theory' of probability to sample testing or inspection