Power Systems Which of the following statements are true? nether 1 nor 2 Bus impedance matrix is a full matrix both 1 and 2 Bus admittance matrix is a sparse matrix nether 1 nor 2 Bus impedance matrix is a full matrix both 1 and 2 Bus admittance matrix is a sparse matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are two six one three two six one three ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.83. 0.25. 0.44. 1.3. 0.83. 0.25. 0.44. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For accurate load flow calculations on large power systems, the best method is All of these G-S method N-R method Decoupled method All of these G-S method N-R method Decoupled method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reheat cycle in thermal power plant is used to increase thermal efficiency. improve condenser performance. reduce loss of heat. utilize heat of flue gases. increase thermal efficiency. improve condenser performance. reduce loss of heat. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm Xs +2 Xm 2Xs + Xm Xm - Xs Xs - Xm Xs +2 Xm 2Xs + Xm Xm - Xs ANSWER DOWNLOAD EXAMIANS APP