Power Systems The term self GMD is used to calculate capacitance both 1 and 2 inductance resistance capacitance both 1 and 2 inductance resistance ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems When bundle conductor are used in place of single conductor the effective inductance and capacitance will respectively increase and decrease. decrease and increase. increase and remain unaffected. decrease and remain unaffected. increase and decrease. decrease and increase. increase and remain unaffected. decrease and remain unaffected. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents both 1 and 2 nether 1 nor 2 short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents both 1 and 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LLG. LL. LLLG. LG. LLG. LL. LLLG. LG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line long transmission line short transmission line medium transmission line any of the above long transmission line short transmission line medium transmission line any of the above ANSWER DOWNLOAD EXAMIANS APP