Power Systems Which of the following power planets is the least reliable Geothermal. Solar. Wind. Tidal. Geothermal. Solar. Wind. Tidal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the firm capacity of plant is increased. kinetic energy of the running water is fully utilized. pressure inside the turbine casing remains. operating head is controlled. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. pressure inside the turbine casing remains. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following are the fertile materials U238 and Th232. U238 and Th239. U238 and Pu239. U233 and Pu239. U238 and Th232. U238 and Th239. U238 and Pu239. U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conversion ratio of breeder reactor are greater than 1. less than 1. 1. none of above. greater than 1. less than 1. 1. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge tank is kept very close to the generator pen stock turbine spill way generator pen stock turbine spill way ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? It requires more maintenance because of running equipment All of these Initial cost of synchronous phase modifier is higher It consumes both active and reactive power It requires more maintenance because of running equipment All of these Initial cost of synchronous phase modifier is higher It consumes both active and reactive power ANSWER DOWNLOAD EXAMIANS APP