Power Systems Which of the following power planets is the least reliable Solar. Tidal. Wind. Geothermal. Solar. Tidal. Wind. Geothermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Positive, negative and zero sequence impedances of line are 2,2 and 5 pu respectively. Find self and mutual impedances respectively? 3 and 1 pu 2 and 5 pu 1 and 3 pu 2 and 2 pu 3 and 1 pu 2 and 5 pu 1 and 3 pu 2 and 2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Durgapur. Bakreshwar. Farakka. Katwa. Durgapur. Bakreshwar. Farakka. Katwa. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 10.936 pu 7.936 pu 8.936 pu 9.936 pu 10.936 pu 7.936 pu 8.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following rotor is used in thermal power plants? cylindrical rotor salient pole rotor squirrel cage rotor either of these cylindrical rotor salient pole rotor squirrel cage rotor either of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be 8.5 MW 6.5 MW 5.5 MW 4.5 MW 8.5 MW 6.5 MW 5.5 MW 4.5 MW ANSWER DOWNLOAD EXAMIANS APP