Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Cooling tower. Condenser. Pulversing unit. Ash handling unit. Cooling tower. Condenser. Pulversing unit. Ash handling unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm sinωt? 2.63 msec 1.47 msec 4.68 msec 9.68 msec 2.63 msec 1.47 msec 4.68 msec 9.68 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plant work? Rankine cycle Bell-Coleman cycle Otto cycle Carnot cycle Rankine cycle Bell-Coleman cycle Otto cycle Carnot cycle ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? Load cycle tests. Thermal stability test. Impulse tests. All of these. Load cycle tests. Thermal stability test. Impulse tests. All of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0 mH/Km 0.025 mH/Km 0.1 mH/Km 0.05 mH/Km 0 mH/Km 0.025 mH/Km 0.1 mH/Km 0.05 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems By using guard ring in a transmission line, its string efficiency None of these decrease increase remains unaffected None of these decrease increase remains unaffected ANSWER DOWNLOAD EXAMIANS APP