Power Systems What are the tests performed for oil-filled and gas-filled cables ? Load cycle tests. Thermal stability test. All of these. Impulse tests. Load cycle tests. Thermal stability test. All of these. Impulse tests. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of insulator discs required in string insulator, if operating voltage is 220 kV and maximum voltage of each disc is 11 kV? 10 21 20 13 10 21 20 13 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum efficiency of modern coal fired steam steam raising thermal power plants is restricted to about 0.35( a low value), mainly because of high energy loss in boilers low alternator efficiency high energy loss in condenser low steam turbine mechanical efficiency high energy loss in boilers low alternator efficiency high energy loss in condenser low steam turbine mechanical efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 29 MHz 29 kHz 2.9 kHz 290 kHz 29 MHz 29 kHz 2.9 kHz 290 kHz ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. none of above. to have large number of small size thermal plants located at different places. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. none of above. to have large number of small size thermal plants located at different places. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed of water turbine is the speed at which the turbine develops unit horse power at unit head. maximum horse power. unit horse power at all heads. a minimum horse power. unit horse power at unit head. maximum horse power. unit horse power at all heads. a minimum horse power. ANSWER DOWNLOAD EXAMIANS APP