Power Systems Where is the draft tube of a hydroelectric plant that is an airtight pipe located In between the runner exhaust and the tail race. At the beginning of the penstock. Near the surge tank. In between the penstock and runner. In between the runner exhaust and the tail race. At the beginning of the penstock. Near the surge tank. In between the penstock and runner. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Rankine cycle, the work output from a turbine is given by change of entropy between inlet and outlet. change in temperature between inlet and outlet. change of enthalpy between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change in temperature between inlet and outlet. change of enthalpy between inlet and outlet. change in internal energy between inlet and outlet. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is used for changing power factor from leading to lagging shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor series capacitor any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3750 kW 6000 kW 7500 kW 3000 kW 3750 kW 6000 kW 7500 kW 3000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Francis turbine runner, the number blades is usually of the order of 6 - 8. 16 - 24. 12 - 14. 3 - 6. 6 - 8. 16 - 24. 12 - 14. 3 - 6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants is/are base load plants both 1 and 2 pump storage nuclear run off river both 1 and 2 pump storage nuclear run off river ANSWER DOWNLOAD EXAMIANS APP