Power Systems At slack bus, which one of the following combinations of variables is not specified? Q and V V and δ P and V P and Q Q and V V and δ P and V P and Q ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plants, pressure in the working fluid cycle is developed by superheater. condenser. turbine. feed water pump. superheater. condenser. turbine. feed water pump. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of load bus are Q and V P and Q P and δ V and δ Q and V P and Q P and δ V and δ ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 4.68 msec 9.68 1.47 msec 2.63 msec 4.68 msec 9.68 1.47 msec 2.63 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation none of above. to have large number of small size thermal plants located at different places. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. none of above. to have large number of small size thermal plants located at different places. to have large size thermal plants near load centre. to have large size thermal plant located near coal fields. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase, 5 kV, 5 MVA system, what is the base impedance? 50 ohms 500 ohms 0.5 ohm 5 ohms 50 ohms 500 ohms 0.5 ohm 5 ohms ANSWER DOWNLOAD EXAMIANS APP