Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge None of these 20% of the design discharge Slightly more than 5% of the design discharge Slightly less than 5% of the design discharge None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering R.M.O. expenses include Operation expenses All of these Maintenance expenses Running expenses Operation expenses All of these Maintenance expenses Running expenses ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drop man holes are generally provided in sewers for Large town ships Cities in plains Hilly town ships Industrial areas Large town ships Cities in plains Hilly town ships Industrial areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is Straightness test Smoke test All listed here Water test Straightness test Smoke test All listed here Water test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The stone ware sewers All listed here Are used for carrying sewage and drainage from houses After casting are dried and burnt at temperature 150°C, 700°C and 1200°C Are manufactured from clays and shale All listed here Are used for carrying sewage and drainage from houses After casting are dried and burnt at temperature 150°C, 700°C and 1200°C Are manufactured from clays and shale ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 3.5 to 4.5 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec 3.5 to 4.5 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec ANSWER DOWNLOAD EXAMIANS APP