Waste Water Engineering The factor responsible for purification of sewage in river is Dissolved oxygen in water Temperature All listed here Hydrology Dissolved oxygen in water Temperature All listed here Hydrology ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 2 hours 1 hour and 30 minutes 1 hour 30 minutes 2 hours 1 hour and 30 minutes 1 hour 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 – P1)/(100 – P2)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 – P1)/(100 – P2)] V1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is 4 hours 2 hours 5 hours 3 hours 4 hours 2 hours 5 hours 3 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Ordinary manhole cannot be built Invert level of a branch sewer is more than 60 cm that of the main sewer Sewer line runs along a main road Two sewer lines intersect Ordinary manhole cannot be built Invert level of a branch sewer is more than 60 cm that of the main sewer Sewer line runs along a main road Two sewer lines intersect ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 200 mg/l 100 mg/l 300 mg/l 400 mg/l 200 mg/l 100 mg/l 300 mg/l 400 mg/l ANSWER DOWNLOAD EXAMIANS APP