Waste Water Engineering The sewerage system consists of Branch sewer Lateral sewer All of these House sewer Branch sewer Lateral sewer All of these House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The factor responsible for purification of sewage in river is Hydrology Temperature All listed here Dissolved oxygen in water Hydrology Temperature All listed here Dissolved oxygen in water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the pH value of sewage is 7 It is acidic It is alkaline None of these It is neutral It is acidic It is alkaline None of these It is neutral ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For detecting the nitrites in the sewage, the matching colour may be developed by adding None of these Phenol-di -sulphuric acid potassium hydroxide Potassium permanganate Sulphuric acid and napthamine None of these Phenol-di -sulphuric acid potassium hydroxide Potassium permanganate Sulphuric acid and napthamine ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Half full Three fourth full Two third full Full depth Half full Three fourth full Two third full Full depth ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to All listed here Superimposed traffic loads Weight of the pipe Weight of the back fill All listed here Superimposed traffic loads Weight of the pipe Weight of the back fill ANSWER DOWNLOAD EXAMIANS APP