Waste Water Engineering The screens are fixed Parallel to the direction of flow At an angle 30° to 60° to the direction of flow None of these Perpendicular to the direction of flow Parallel to the direction of flow At an angle 30° to 60° to the direction of flow None of these Perpendicular to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of sewer lines Water test is carried out to check water tightness of the joints Obstruction test is carried out with the help of smooth ball of diameter 13 mm Test for straightness is carried out with the help of a lamp and mirror All listed here Water test is carried out to check water tightness of the joints Obstruction test is carried out with the help of smooth ball of diameter 13 mm Test for straightness is carried out with the help of a lamp and mirror All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of fresh sewage is usually Less than 7 Equal to zero Equal to 7 More than 7 Less than 7 Equal to zero Equal to 7 More than 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.425 D 1.625 D 1.250 D 1.350 D 1.425 D 1.625 D 1.250 D 1.350 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is 1 in 100 1 in 60 1 in 120 None of these 1 in 100 1 in 60 1 in 120 None of these ANSWER DOWNLOAD EXAMIANS APP