Waste Water Engineering In case of sewer lines Obstruction test is carried out with the help of smooth ball of diameter 13 mm Test for straightness is carried out with the help of a lamp and mirror All listed here Water test is carried out to check water tightness of the joints Obstruction test is carried out with the help of smooth ball of diameter 13 mm Test for straightness is carried out with the help of a lamp and mirror All listed here Water test is carried out to check water tightness of the joints ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Carbon dioxide Oxygen Hydrogen sulphide Methane Carbon dioxide Oxygen Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most dangerous pollutant in vehicular emissions is O₂ CO₂ CO₂ SO₂ O₂ CO₂ CO₂ SO₂ ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 22.5 cm c/c 30 cm c/c 15 cm c/c 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c 50 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 12 days 7 days 2 days 14 days 12 days 7 days 2 days 14 days ANSWER DOWNLOAD EXAMIANS APP