Waste Water Engineering In case of sewer lines All listed here Test for straightness is carried out with the help of a lamp and mirror Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints All listed here Test for straightness is carried out with the help of a lamp and mirror Obstruction test is carried out with the help of smooth ball of diameter 13 mm Water test is carried out to check water tightness of the joints ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 10 days 20 days 30 days 60 days 10 days 20 days 30 days 60 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Oxidation process results in the formation of Carbon dioxide Sulphates Nitrates All of these Carbon dioxide Sulphates Nitrates All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is 1 in 100 1 in 120 None of these 1 in 60 1 in 100 1 in 120 None of these 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.350 D 1.250 D 1.425 D 1.625 D 1.350 D 1.250 D 1.425 D 1.625 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Silting occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Silting occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom ANSWER DOWNLOAD EXAMIANS APP