Power Systems Uses of diesel power stations emergency plants. peak load plant. All of these standby plants. emergency plants. peak load plant. All of these standby plants. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 9.936 pu 7.936 pu 10.936 pu 8.936 pu 9.936 pu 7.936 pu 10.936 pu 8.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hectograph. Monograph. Hydro-graph. Load duration curve. Hectograph. Monograph. Hydro-graph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? Corona is reduced by All of these increasing the distance between the conductor increasing the radius of the conductor decreasing the supply frequency All of these increasing the distance between the conductor increasing the radius of the conductor decreasing the supply frequency ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system? 1 A. 1.476 A. 14.76 A. 14.7 mA. 1 A. 1.476 A. 14.76 A. 14.7 mA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plants, pressure in the working fluid cycle is developed by condenser. feed water pump. turbine. superheater. condenser. feed water pump. turbine. superheater. ANSWER DOWNLOAD EXAMIANS APP