Power Systems Uses of diesel power stations peak load plant. standby plants. emergency plants. All of these peak load plant. standby plants. emergency plants. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 66 kV lines the number of insulator discs of each 11 kV used are 6 3 5 12 6 3 5 12 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? Unreliable convergence A good initial guess for voltages is essential for convergence Choice of slack bus affects the convergence Slow convergence Unreliable convergence A good initial guess for voltages is essential for convergence Choice of slack bus affects the convergence Slow convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be 8.5 MW 6.5 MW 4.5 MW 5.5 MW 8.5 MW 6.5 MW 4.5 MW 5.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching SF6. air blast. vacuum. oil. SF6. air blast. vacuum. oil. ANSWER DOWNLOAD EXAMIANS APP