Power Systems Objectives of power system is/are Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum nether 1 nor 2 both 1 and 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Cheapest plant in operation and maintenance is steam power. nuclear. diesel power. hydroelectric. steam power. nuclear. diesel power. hydroelectric. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The VSWR of transmission line is Directly proportional to load impedance and inversely to characteristic impedance. Directly proportional to voltage minimum and inversely proportional to voltage maximum. Proportional to load and characteristic impedance. Directly proportional to characteristic impedance and inversely to load impedance. Directly proportional to load impedance and inversely to characteristic impedance. Directly proportional to voltage minimum and inversely proportional to voltage maximum. Proportional to load and characteristic impedance. Directly proportional to characteristic impedance and inversely to load impedance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Among the following which is not non conventional energy Nuclear. Geothermal. Wind. Tidal. Nuclear. Geothermal. Wind. Tidal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 105.2 85.5 95.5 102.5 105.2 85.5 95.5 102.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW ANSWER DOWNLOAD EXAMIANS APP