Building Construction To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as Bat Stretcher Header Closer Bat Stretcher Header Closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The triangular portion between any two adjacent arches and the tangent to their crowns, is Rise Spandril Soffit Haunch Rise Spandril Soffit Haunch ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 1, 2, 3, 4, 5 3, 2, 5, 1, 4 5, 4, 3, 2, 1 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The pile provided with one or more bulles in its vertical shaft, is generally known as Sheet pile Bearing pile Under-ream pile Friction pile Sheet pile Bearing pile Under-ream pile Friction pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Franki pile Pedestal pile Vibro pile Pressure pile Franki pile Pedestal pile Vibro pile Pressure pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction For constructing a terrazzo floor, Pick up the incorrect statement from the following: A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material A base course is prepared as in cement concrete flooring Glass strips are driven into the layer according to the pattern required A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material ANSWER DOWNLOAD EXAMIANS APP