Building Construction The lower half portion between crown and skew back of the arch, is called Spandril Haunch Soffit Springing Spandril Haunch Soffit Springing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 4 days 14 days 1 day 7 days 4 days 14 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction Expansion joints in masonry walls are provided if length exceeds 40 m 10 m 30 m 20 m 40 m 10 m 30 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Brick nogging type of partition wall, is constructed by Laying bricks as stretchers in cement mortar Laying bricks as headers in cement mortar Constructing brick work within a wooden framework Reinforcing brick wall with iron straps Laying bricks as stretchers in cement mortar Laying bricks as headers in cement mortar Constructing brick work within a wooden framework Reinforcing brick wall with iron straps ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with the 4 to 6 mm marble chips, is known Chip floor Reinforced marble floor Marble floor Terrazzo floor Chip floor Reinforced marble floor Marble floor Terrazzo floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the commonly adopted geophysical method in civil engineering from the following: Electrical resistivity method The seismic method Both (A) and (B) of the above Gravitational method Electrical resistivity method The seismic method Both (A) and (B) of the above Gravitational method ANSWER DOWNLOAD EXAMIANS APP