Power Systems The value of inductance used for compensation of arcing grounds is 3ω²C ω²C/3 3/ω²C 1/3ω²C 3ω²C ω²C/3 3/ω²C 1/3ω²C ANSWER DOWNLOAD EXAMIANS APP
Power Systems Normally Z bus matrix is a full matrix unit matrix null matrix sparse matrix full matrix unit matrix null matrix sparse matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW 12 MW 10 MW 5 MW 6 MW 12 MW 10 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a 500 Hz frequency excitation, a 100 km long power line will be modelled as long transmission line any of the above shunt capacitor medium transmission line long transmission line any of the above shunt capacitor medium transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CANDU reactor uses natural uranium as fuel and heavy water as moderator and coolant. enriched uranium as fuel and ordinary water as moderator and cooler. highly enriched uranium as fuel and water as moderator and coolant. only fertile materials. natural uranium as fuel and heavy water as moderator and coolant. enriched uranium as fuel and ordinary water as moderator and cooler. highly enriched uranium as fuel and water as moderator and coolant. only fertile materials. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by atomic power station of the same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by atomic power station of the same output. less than that required by hydro-power station of same capacity. ANSWER DOWNLOAD EXAMIANS APP