Building Construction The stepped structure provided for lateral support of a structure, is Retaining wall Buttress Breast wall Parapet wall Retaining wall Buttress Breast wall Parapet wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 40 mm 20 mm 30 mm 10 mm 40 mm 20 mm 30 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span 1/12th of the span 1/8th of the span 1/6th of the span 1/10th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical side member of a shutter frame, is known Mullion Reveal Post Style Mullion Reveal Post Style ANSWER DOWNLOAD EXAMIANS APP
Building Construction Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is, Q = Wh/2.5 (S + 6) Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) Q = Wh/2.5 (S + 6) Q = Wh/6 (S + 2.5) Q = (W × 6)/h (S + 2.5) Q = (W × 2.5)/6 (S + h) ANSWER DOWNLOAD EXAMIANS APP