Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 1.5 m > 1.5 m 0.9 cm 1.2 m 1.5 m > 1.5 m 0.9 cm 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To maintain aerobic biological activity, the moisture content of the compost mass should be about 0.6 0.45 0.5 0.55 0.6 0.45 0.5 0.55 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed 3 2.5 2 1.5 3 2.5 2 1.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The asbestos cement sewers are Not structurally strong to bear large compressive stress Light in weight Susceptible to corrosion by sulphuric acid All of these Not structurally strong to bear large compressive stress Light in weight Susceptible to corrosion by sulphuric acid All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage is pumped up From basements From flat areas All listed here From low lying areas From basements From flat areas All listed here From low lying areas ANSWER DOWNLOAD EXAMIANS APP