Waste Water Engineering
¾th or ¼th extra space is left in sewer pipes at maximum discharge for

Unexpected increase in population
All listed here
Large scale infiltration of storm water
Low estimates of the average and maximum flows

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In the activated sludge process

Aeration is continued till stability
Water is removed by centrifugal action
Aeration is done with an admixture of previously aerated sludge
Sludge is activated by constant stirring

ANSWER DOWNLOAD EXAMIANS APP