Waste Water Engineering

Waste Water Engineering
Design period of 40 to 50 years is adopted for

All listed here
Branch sewers
Main sewers
Trunk sewers

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Flocculated particles do not change their

Shape
Weight
None of these
Size

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The screens are fixed

At an angle 30° to 60° to the direction of flow
Parallel to the direction of flow
None of these
Perpendicular to the direction of flow

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Chlorination of water is done for the removal of

Suspended solids
Sediments
Hardness
Bacterias

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Dry water flow in a combined sewer, is

Industrial sewage
Domestic sewage
Inclusive of domestic and industrial sewage but excludes storm water
Storm water

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The asbestos cement pipes are generally laid

At an angle of 30°
Horizontally
At an angle of 60°
Vertically

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑