Building Construction The rock formed from the solidification of molten matter (magma) is called: None of these Sedimentary rock Igneous rock Metamorphic rock None of these Sedimentary rock Igneous rock Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Develops due to lowering of ground water Neither (A) not (B) Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Develops due to lowering of ground water Neither (A) not (B) Both (A) and (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone masonry of finely dressed stones laid in cement or lime, is Ashlar masonry Random rubble masonry Dry rubble masonry Coursed rubble masonry Ashlar masonry Random rubble masonry Dry rubble masonry Coursed rubble masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 7 days 1 day 14 days 4 days 7 days 1 day 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Hard rocks Dry coarse sandy soil Loose fine sandy soil Black cotton soil Hard rocks Dry coarse sandy soil Loose fine sandy soil Black cotton soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 1.2 m 0.7 m 0.5 m 0.9 m 1.2 m 0.7 m 0.5 m ANSWER DOWNLOAD EXAMIANS APP