Industrial Engineering and Production Management The purpose of micro-motion study is to Assist in finding out the most efficient way of doing work Train the individual operator regarding the motion economy principles Help in collecting the motion time data for synthetic time standards All of these Assist in finding out the most efficient way of doing work Train the individual operator regarding the motion economy principles Help in collecting the motion time data for synthetic time standards All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT is the Time oriented technique Event oriented technique Activity oriented technique Target oriented technique Time oriented technique Event oriented technique Activity oriented technique Target oriented technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which one of the following techniques is used for determining allowances in time study? Performance rating Linear regression Work sampling Acceptance sampling Performance rating Linear regression Work sampling Acceptance sampling ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 1.15 HA 2 HA 1.5 HA 1.33 HA 1.15 HA 2 HA 1.5 HA 1.33 HA ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The break-even point represents The time when unit can run without any loss and profit Time when industry will undergo loss The time when company can make maximum profits The most economical level of operation of any industry The time when unit can run without any loss and profit Time when industry will undergo loss The time when company can make maximum profits The most economical level of operation of any industry ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Dummy activities are used to Determine the critical path Determine the project completion time None of these Maintain the required net work Determine the critical path Determine the project completion time None of these Maintain the required net work ANSWER DOWNLOAD EXAMIANS APP