Surveying The necessary geometrical condition for triangulation adjustment is: All listed here The sum of the eight angles of a braced quadrilateral should be 360° The sum of the angles around a station should be 360° The sum of the three angles of a plane triangle should be 180° All listed here The sum of the eight angles of a braced quadrilateral should be 360° The sum of the angles around a station should be 360° The sum of the three angles of a plane triangle should be 180° ANSWER DOWNLOAD EXAMIANS APP
Surveying The angle between the plane of the equator and the plane of the ecliptic, is known as obliquity of the ecliptic and its value is 24° 0' 23° 27' 23° 30' 22° 30' 24° 0' 23° 27' 23° 30' 22° 30' ANSWER DOWNLOAD EXAMIANS APP
Surveying The orthogonal projection of the perspective centre on a tilted photograph, is called Plumb point Nadir Principal point Isocenter Plumb point Nadir Principal point Isocenter ANSWER DOWNLOAD EXAMIANS APP
Surveying The number of horizontal cross wires in a stadia diaphragm is four three one two four three one two ANSWER DOWNLOAD EXAMIANS APP
Surveying In the cross-section method of indirect contouring, the spacing of cross-sections depends uponi) contour intervalii) scale of planiii) characteristics of groundThe correct answer is (i) and (ii) (i), (ii) and (iii) only (i) (ii) and (iii) (i) and (ii) (i), (ii) and (iii) only (i) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Surveying The distance between the projection centre and the photograph, is called Focal length Principal line Principal distance Isocentric distance Focal length Principal line Principal distance Isocentric distance ANSWER DOWNLOAD EXAMIANS APP