Irrigation Engineering The most suitable location of a canal head work, is Rock stage of the river Trough stage of the river Delta stage of the river Boulders stage of the river Rock stage of the river Trough stage of the river Delta stage of the river Boulders stage of the river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If D₁ and D₂ are depths of water upstream and downstream of a hydraulic jump, the loss of head at the jump, is (D₂ - D₁)3/2D₁D₂ (D₂ - D₁)3/3D₁D₂ (D₂ - D₁)3/4D₁D₂ (D₂ - D₁)3/D₁D₂ (D₂ - D₁)3/2D₁D₂ (D₂ - D₁)3/3D₁D₂ (D₂ - D₁)3/4D₁D₂ (D₂ - D₁)3/D₁D₂ ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Right side Left side Both sides All listed here Right side Left side Both sides All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 70mm 80mm 90 mm 105 mm 70mm 80mm 90 mm 105 mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Canals taken off from ice-fed perennial rivers, are known Perennial canals Ridge canals Permanent canals Inundation canals Perennial canals Ridge canals Permanent canals Inundation canals ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For smooth entry of water in a canal, the angle between head regulator and water is generally kept 80° 90° 110° 120° 80° 90° 110° 120° ANSWER DOWNLOAD EXAMIANS APP