Irrigation Engineering
Horizontal acceleration due to earthquake results in

inertia force into the body of the dam
both (A) and (B)
hydrodynamic pressure
None of these

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct sequence of the part of a canal system from the following

Head works-main canal-branch canal-minor-distributary
Heads works-branch canal-main canal distributary, minor
Head work-distributary-branch canal-minor
Head works-main canal-branch canal-distributary-minor

ANSWER DOWNLOAD EXAMIANS APP