Irrigation Engineering A hydraulic structure is designed to withstand Hydraulic jump All of these Seepage forces Hydraulic pressure Hydraulic jump All of these Seepage forces Hydraulic pressure ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Field on the left side of the canal Field on the right side of the canal Central half width of the section of the canal Fields on both sides of the canal Field on the left side of the canal Field on the right side of the canal Central half width of the section of the canal Fields on both sides of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Both sides Left side Right side All listed here Both sides Left side Right side All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering With the increase in the quantity of water supplied, the yield of most crops increases upto a certain limit and then becomes constant increases continuously increases upto a certain limit and then decreases decreases continuously increases upto a certain limit and then becomes constant increases continuously increases upto a certain limit and then decreases decreases continuously ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For the upstream face of an earthen dam, the most adverse condition for stability of slope is during construction steady seepage sudden drawdown sloughing of slope during construction steady seepage sudden drawdown sloughing of slope ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The useful storage is the volume of water stored in the reservoir between river bed and minimum pool level minimum pool level and maximum pool level normal pool level and maximum pool level minimum pool level and normal pool level river bed and minimum pool level minimum pool level and maximum pool level normal pool level and maximum pool level minimum pool level and normal pool level ANSWER DOWNLOAD EXAMIANS APP