Irrigation Engineering
Infiltration rate is always

less than the infiltration capacity
equal to or less than the infiltration capacity
more than the infiltration capacity
equal to or more than the infiltration capacity

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct statement from the following and answer

All of these
In a level crossing, a cross regulator is provided on the canal below the crossing
In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
In a level crossing a regulator is provided across the drainage at its down-stream

ANSWER DOWNLOAD EXAMIANS APP