Building Construction The mortar in which both cement and lime are used as binding materials, is called Fire resistant mortar Lime mortar Gauged mortar Cement mortar Fire resistant mortar Lime mortar Gauged mortar Cement mortar ANSWER DOWNLOAD EXAMIANS APP
Building Construction The brick laid with its breadth parallel to the face of a wall, is known as Stretcher None of these Header Closer Stretcher None of these Header Closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The maximum projection of the corbel should not be more than the thickness of the wall The discontinuous corbels are used to carry heavy concentrated loads ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Prevention of dampness All of these Heat insulation Sound insulation Prevention of dampness All of these Heat insulation Sound insulation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The predominant constituent which is responsible for strength in granite is None of these Quartz Mica Felspar None of these Quartz Mica Felspar ANSWER DOWNLOAD EXAMIANS APP
Building Construction An arch constructed with finely dressed stones, is known Gauged arch Ashlar arch Rubble arch Axed arch Gauged arch Ashlar arch Rubble arch Axed arch ANSWER DOWNLOAD EXAMIANS APP