Waste Water Engineering The minimum recommended diameter of sewers, is 15 cm 10 cm 5 cm 20 cm 15 cm 10 cm 5 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 160 cm 120 cm 140 cm 100 cm 160 cm 120 cm 140 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Two to three hours Six hours One hour Three to four hours Two to three hours Six hours One hour Three to four hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Traps Create symphonic action to increase the quick disposal of sewerage Dissolve the foul gases Are used to trap the rats entering sewers Are water seals which prevent the entry of foul gases Create symphonic action to increase the quick disposal of sewerage Dissolve the foul gases Are used to trap the rats entering sewers Are water seals which prevent the entry of foul gases ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 30 litres/person/month 25 litres/person/year 30 litres/person/year 25 litres/person/month 30 litres/person/month 25 litres/person/year 30 litres/person/year 25 litres/person/month ANSWER DOWNLOAD EXAMIANS APP