Waste Water Engineering A circular sewer section is preferred to because It provides maximum area for a given perimeter All listed here It is cheaper in construction It provides maximum hydraulic mean depth It provides maximum area for a given perimeter All listed here It is cheaper in construction It provides maximum hydraulic mean depth ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 140 cm 120 cm 160 cm 100 cm 140 cm 120 cm 160 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Facultative bacteria survive in The presence of oxygen Neither A nor B Both cases A and B The absence of oxygen The presence of oxygen Neither A nor B Both cases A and B The absence of oxygen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by All listed here The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material Pressure sewers are designed to be safe in tension All listed here The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material Pressure sewers are designed to be safe in tension ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 3 m 4.5 m 4 m 3.5 m 3 m 4.5 m 4 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D3/2 = 4 b3/2 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D8/3 = 4 b8/3 D3/2 = 4 b3/2 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D8/3 = 4 b8/3 ANSWER DOWNLOAD EXAMIANS APP