Waste Water Engineering A circular sewer section is preferred to because It is cheaper in construction It provides maximum area for a given perimeter All listed here It provides maximum hydraulic mean depth It is cheaper in construction It provides maximum area for a given perimeter All listed here It provides maximum hydraulic mean depth ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 2.0 m 3.0 m 4.0 m 1.0 m 2.0 m 3.0 m 4.0 m 1.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Lateral sewer Sewer outfall Branch sewer House sewer Lateral sewer Sewer outfall Branch sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Facultative bacteria survive in The absence of oxygen Neither A nor B The presence of oxygen Both cases A and B The absence of oxygen Neither A nor B The presence of oxygen Both cases A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is 1 in 100 1 in 120 None of these 1 in 60 1 in 100 1 in 120 None of these 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The algae dies out in the zone of Recovery Active decomposition Degradation Cleaner water Recovery Active decomposition Degradation Cleaner water ANSWER DOWNLOAD EXAMIANS APP