Waste Water Engineering The sludge does not contain waste water from Wash basins Kitchen sinks Toilets Bath rooms Wash basins Kitchen sinks Toilets Bath rooms ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept All of these Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept All of these Flow velocity 0.15 m to 0.3 m/sec is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called House sewer Branch sewer Out-fall sewer Main sewer House sewer Branch sewer Out-fall sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Carbondioxide is formed Nitrites are formed Ammonia is formed Nitrates are formed Carbondioxide is formed Nitrites are formed Ammonia is formed Nitrates are formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In trickling filter, B.O.D. is reduced to 80 to 90% 30 to 40% 60 to 80% 40 to 60% 80 to 90% 30 to 40% 60 to 80% 40 to 60% ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours ANSWER DOWNLOAD EXAMIANS APP