Waste Water Engineering The sludge does not contain waste water from Wash basins Kitchen sinks Toilets Bath rooms Wash basins Kitchen sinks Toilets Bath rooms ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized segregation Mechanized receipt All of these Mechanized pulverising of refuse Mechanized segregation Mechanized receipt All of these Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Oxidation Purification Dilution Irrigation Oxidation Purification Dilution Irrigation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 1 minute 5 minutes 3 minutes 2 minutes 1 minute 5 minutes 3 minutes 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 200 mg/l 300 mg/l 100 mg/l 400 mg/l 200 mg/l 300 mg/l 100 mg/l 400 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Main sewer Branch sewer House sewer Out-fall sewer Main sewer Branch sewer House sewer Out-fall sewer ANSWER DOWNLOAD EXAMIANS APP