Waste Water Engineering The drop man holes are generally provided in sewers for Large town ships Cities in plains Hilly town ships Industrial areas Large town ships Cities in plains Hilly town ships Industrial areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 20 days 10 days 60 days 30 days 20 days 10 days 60 days 30 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to All of these Silting Greasy and oily matters Low discharge All of these Silting Greasy and oily matters Low discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 2.5 to 3.0 m/sec 3.5 to 4.5 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec 3.5 to 4.5 m/sec 3.0 to 4.0 m/sec 4.5 to 5.5 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Lower end of ventilating column Upper end of ventilating column First step in manhole Upper end of the manhole Lower end of ventilating column Upper end of ventilating column First step in manhole Upper end of the manhole ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the end of septic tanks At the beginning of sewer line With a W.'trap On manholes At the end of septic tanks At the beginning of sewer line With a W.'trap On manholes ANSWER DOWNLOAD EXAMIANS APP