Highway Engineering The minimum design speed for hairpin bends in hill roads is taken as 50 kmph 40 kmph 30 kmph 20 kmph 50 kmph 40 kmph 30 kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day 2000 tonnes per day 1000 tonnes per day 500 tonnes per day 1500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from upper edge towards the lower edge centre towards the sides lower edge towards the upper edge sides towards the centre upper edge towards the lower edge centre towards the sides lower edge towards the upper edge sides towards the centre ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tie bars in cement concrete pavements are at warping joints longitudinal joints contraction joints expansion joints warping joints longitudinal joints contraction joints expansion joints ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows all important physical conditions of an accident location like roadway limits, bridges, trees and all details of roadway conditions is known as condition diagram collision diagram pie chart spot maps condition diagram collision diagram pie chart spot maps ANSWER DOWNLOAD EXAMIANS APP