Highway Engineering Creep is the Vertical movement of rail Longitudinal movement of rail Difference in level of two rails Lateral movement of rail Vertical movement of rail Longitudinal movement of rail Difference in level of two rails Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Seal coat Spray of emulsion Tack coat Prime coat Seal coat Spray of emulsion Tack coat Prime coat ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to five times the overtaking sight distance three times the overtaking sight distance overtaking sight distance two times the overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance overtaking sight distance two times the overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum design gradient for vertical profile of a road is ruling gradient limiting gradient exceptional gradient minimum gradient ruling gradient limiting gradient exceptional gradient minimum gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For highway geometric design purposes the speed used is 98 “”percentile 15th percentile 50 “”percentile 85th percentile 98 “”percentile 15th percentile 50 “”percentile 85th percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.4 % 0.8 % 0.6 % 1.0 % 0.4 % 0.8 % 0.6 % 1.0 % ANSWER DOWNLOAD EXAMIANS APP