Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine total units of energy available. total power available at the site. diversity factor for the plant. load factory at the plant. total units of energy available. total power available at the site. diversity factor for the plant. load factory at the plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 4 bus,4×4 Y bus matrix the number of non zero elements are 12. Find the number of transmission lines? 2 5 4 8 2 5 4 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the diameter of the conductor is increased the resistance is increased the inductance is increased no change in inductance and resistance the inductance is decreased the resistance is increased the inductance is increased no change in inductance and resistance the inductance is decreased ANSWER DOWNLOAD EXAMIANS APP
Power Systems String efficiency depends upon no. of SCR in the string. all of these. voltage rating of one SCR. voltage rating of whole string. no. of SCR in the string. all of these. voltage rating of one SCR. voltage rating of whole string. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of gauss siedel method is/are number of iterations are less All of these applicable for large power system network calculation time for each iteration is less number of iterations are less All of these applicable for large power system network calculation time for each iteration is less ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie + b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie +1/ b.Δf ANSWER DOWNLOAD EXAMIANS APP