Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hydro-graph. Monograph. Hectograph. Load duration curve. Hydro-graph. Monograph. Hectograph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 1 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. 3 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass of the fuel is the amount required to make the multiplication factor less than 1. equal to factor. more than 1. 0.5. less than 1. equal to factor. more than 1. 0.5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Positive, negative and zero sequence impedances of line are 2,2 and 5 pu respectively. Find self and mutual impedances respectively? 2 and 2 pu 1 and 3 pu 2 and 5 pu 3 and 1 pu 2 and 2 pu 1 and 3 pu 2 and 5 pu 3 and 1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plant capacity factor value is 0 1 less than 1 greater than 1 0 1 less than 1 greater than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Taking the density of water to be 1000 kg/m³, how much power would be developed by a hydro electric generator unit, assume 100% efficiency, with 1 m head and 1 m³/s discharge? 2.90 kW 4.45 kW 19.60 kW 9.81 kW 2.90 kW 4.45 kW 19.60 kW 9.81 kW ANSWER DOWNLOAD EXAMIANS APP