India 1st nuclear plant was set up at

  Tarapur.
  Rana pratap sagar.
  Bhaba.
  Kalpakkam.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The insulation of modern EHV is designed based on

  switching voltage.
 RI.
 corona.
 lightning voltage.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The positive sequence reactance will be equal to negative sequence if the equipment is

  transformer and transmission lines.
  motor.
  none of these.
  generator.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 1-phase transmission line has an impedance (4 + 3j ) Ω. Find the power factor of the load for zero voltage regulation?

 0.8 lag
 0.8 lead
 0.6 lag
 0.6 lead

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Area under the daily curve divided by 24 gives

 units generated
 maximum load
 average load
 maximum demand

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be

 710 MW.
 730 MW.
  720 MW.
 740 MW.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑