Power Systems India 1st nuclear plant was set up at Bhaba. Kalpakkam. Tarapur. Rana pratap sagar. Bhaba. Kalpakkam. Tarapur. Rana pratap sagar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When series reactor is used in generating stations, the fault current magnitude is increased remains unaffected any of the above reduced increased remains unaffected any of the above reduced ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 1500 MW 750 MW 1250 MW 1000 MW 1500 MW 750 MW 1250 MW 1000 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows: IR1 = j1.5 pu, IR2 = -j0.5 pu, IR0 = -j1. The type of fault is LL LLG LLL LG LL LLG LLL LG ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 20 - 25 %. 0.5 - 1.5 %. 10 - 15 %. 15 - 20 %. 20 - 25 %. 0.5 - 1.5 %. 10 - 15 %. 15 - 20 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The arc voltage produced in an AC circuit breaker is always in phase opposition with the arc current. in phase with the arc current. lagging the arc current by 90°. leading the arc current by 90°. in phase opposition with the arc current. in phase with the arc current. lagging the arc current by 90°. leading the arc current by 90°. ANSWER DOWNLOAD EXAMIANS APP