Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances are 0.8 and 0 pu respectively. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.6 and 0.6 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 0.8 pu 0.6, 0.8 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 0.8 pu 0.6, 0.8 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems ACSR means Aluminium conductor steel reinforced Aluminium copper steel reinforced Aluminium core steel reinforced all conductor steel reinforced Aluminium conductor steel reinforced Aluminium copper steel reinforced Aluminium core steel reinforced all conductor steel reinforced ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deflectors are provided in Kaplan turbine. Francis turbine. propeller turbine. Pelton wheel. Kaplan turbine. Francis turbine. propeller turbine. Pelton wheel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the characteristic impedance of a transmission line, if impedance is 16 Ω and admittance is 0.1 mâ„§? 160 Ω 200 Ω 400 Ω 320 Ω 160 Ω 200 Ω 400 Ω 320 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed of water turbine is the speed at which the turbine develops maximum horse power. unit horse power at unit head. a minimum horse power. unit horse power at all heads. maximum horse power. unit horse power at unit head. a minimum horse power. unit horse power at all heads. ANSWER DOWNLOAD EXAMIANS APP