Building Construction The 19 cm × 9 cm side of a brick as seen in the wall face, is generally known as Face Stretcher Front Header Face Stretcher Front Header ANSWER DOWNLOAD EXAMIANS APP
Building Construction The compaction of concrete in the drilled pile hole is done by compressed air in the case of Pressure pile Simplex pile Franki pile Vibro pile Pressure pile Simplex pile Franki pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Two columns 50 cm × 50 cm and 60 cm × 60 cm carry 80 tonnes and 120 tonnes of loads respectively. The centre to centre distance between columns is 5.00 metres. The permissible bearing capacity of the soil is 20 t/m2. If the footing is not to project more than 25 cm beyond the outside of the smaller column, pick up the correct design parameters of the footing from the following: All listed here Distance of The length of the foundation slab = 7.00 m G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 All listed here Distance of The length of the foundation slab = 7.00 m G. of the loads from the smaller column = 3.00 m Area of footing slab = 11.00 m2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lintels are preferred to arches because All of these Arches require more headroom to span the openings like doors, windows etc. Arches require strong abutments to withstand arch thrust Arches are difficult in construction All of these Arches require more headroom to span the openings like doors, windows etc. Arches require strong abutments to withstand arch thrust Arches are difficult in construction ANSWER DOWNLOAD EXAMIANS APP
Building Construction For each storey (or, story) of a building, the depth of exploration should be 1 meter 2 meters 4 meters 3 meters 1 meter 2 meters 4 meters 3 meters ANSWER DOWNLOAD EXAMIANS APP
Building Construction In verandah (corridor) floors outward slope is 1 in 50 1 in 40 1 in 70 1 in 60 1 in 50 1 in 40 1 in 70 1 in 60 ANSWER DOWNLOAD EXAMIANS APP